2013 07 25

Shipment of equipment for Ekibastuz GRES-1 is completed (Photo Gallery)

Shipment of equipment for Ekibastuz GRES-1- sam_0023_resize.jpg (thumb, 215x161)Shipment of equipment under Ekibastuz GRES-1 (EGRES-1, Ekibastuz, Kazakhstan) project, one of the largest projects of Jurby WaterTech International in Kazakhstan’s energy sector this year, is completed. The agreement on “Reconstruction and technical improvement of water treatment plants for needs of Ekibastuz GRES-1 named after Bulat Nurzhanov“  was concluded in 2012.

As of today, a total of 44 trucks have been shipped to the Customer. The technical; specialists of our company have performed a complete set of works for EGRES-1: technical documentation was prepared in the in-house Design Department of the company within the shortest possible time and all units of equipment included in a water treatment system for this object were assembled at the manufacturing facilities in Kaunas. At present, Jurby WaterTech International’s technicians execute the onsite construction and installation works. 

Photos from the object are available here >>>

We would remind you that Jurby WaterTech International is currently engaged also in shipping of equipment under Ekibastuz GRES-2 project.

form-link

Благодарим! Сообщение успешно отправлено. В ближайшее время с Вами свяжутся наши специалисты.

form-link