2013 06 11

Main part of powerful water treatment complex for Ekibastuz GRES-1 (Kazakhstan) project is shipped

Shipment-of-water-treatment-complex-for-ekibastuz-gres-1- img_4555_resize.jpg (thumb, 215x161)News of Jurby WaterTech International’s Production and Logistics Division: main part of equipment for powerful water treatment complex designed for Ekibastuz GRES-1 (Ekibastuz, Kazakhstan) is shipped. As is reported from Logistics Division of our company, at present, 23 out of 40 scheduled trucks are already shipped. The works on delivery of equipment for GRES are executed ahead of established schedule. Ekibastuz GRES-1 project is one of the most large-scale projects of Jurby WaterTech International this year and the largest one executed by our company in the Republic of Kazakhstan.

It is a remainder that our company is currently engaged in simultaneous execution of several major projects for Kazakhstan’s energy sector. These are Ekibastuz GRES-1 and Ekibastuz GRES-2 projects, as well as, TPP-2 in Astana.

To read more on Ekibastuz GRES-1 project, use the link  >>>  

form-link

Благодарим! Сообщение успешно отправлено. В ближайшее время с Вами свяжутся наши специалисты.

form-link