2015 08 21

Jurby WaterTech International installed equipment at JSC TAGMET

4.jpg (thumb, 161x161)Under the agreement with JSC Cryogenmash,  Jurby WaterTech International  supplied two AquaDOS dosing stations for the newly constructed object, an oxygen plant intended to provide with oxygen the technological steel melting process in EAF -150 (an electric arc furnace having a capacity of 150 tonnes per heat) at TAGMET, Taganrog.

At the object, during the equipment installation, two systems for stabilization treatment of circulating water for the opened and closed cycles operated automatically were installed. In July 2015, the start-up and commissioning works were performed at the installed stations: the equipment was brought to regime and the operational personnel was trained in methods for controlling the water-chemical regime of circulating systems, safety JurbySoft handling practices, chemical analysis execution and more.

The equipment developed by our company will provide the operation of the oxygen-compressor equipment and pipes under the non-scale forming condition with the minimum rate of corrosion of steel and non-ferrous metals  which were used for the manufacture of the cooling equipment.

form-link

Благодарим! Сообщение успешно отправлено. В ближайшее время с Вами свяжутся наши специалисты.

form-link