Installation of treatment facilities

suek3.jpg (mini, 155x56)Jurby WaterTech, UAB has started installation of the treatment facilities for utility-sanitary wastewater from the coal mine JSC SUEK-Kuzbass. The wastewater treatment plant uses membrane bioseparation technology, which makes it possible to significantly reduce the volume of shell and core development, reduce the overall dimensions of the treatment plant and considerably increase the efficiency of treatment.

To date, the following works have been completed:

1. Transportation from the storage site of modular containers with equipment to the installation site.
2. Installation of block-modular containers in the design position.
3. Hydrostatic testing of 2 tanks with a capacity of 100 m3 each.

The next stages of work are as follows:

1. Installation of technological and electrical internodal piping and fittings
2. Installation of membrane modules
3. Commissioning and putting in operation.

photo-2021-02-15-10-41-14.jpg (regular, 500x375)

photo-2021-02-16-09-34-46.jpg (regular, 500x375)

photo-2021-02-19-14-37-26.jpg (thumb, 215x161)                       photo-2021-02-19-14-37-261.jpg (thumb, 215x161)

photo-2021-02-26-08-32-20.jpg (regular, 500x375)

photo-2021-02-26-09-50-56.jpg (regular, 500x375)

photo-2021-03-02-09-33-09.jpg (regular, 500x375)

form-link

Благодарим! Сообщение успешно отправлено. В ближайшее время с Вами свяжутся наши специалисты.

form-link