2014 11 21

Company straightens its positions in Estonian power industry

Jurby WaterTech International begins cooperation with Tallinn Power Plant. At this moment design for revamp of flue gas condensate treatment equipment is being elaborated. These design solutions will allow to use the treated flue gas condenste as a makeup water for district heating, which now is discharged as a waste water.

At this moment Tallin Power Plant’s electricity capacity is 25 MW, and heating capacity is 67 MW. It is planned to raise electricity manufacture up to 180 GW/year and manufacture of heating up to 480 GW/year.

form-link

Благодарим! Сообщение успешно отправлено. В ближайшее время с Вами свяжутся наши специалисты.

form-link