2016 02 15

Jurby WaterTech International has shipped equipment for Astana TPP-3

Jurby WaterTech International has shipped equipment on project, Water treatment for heat network and boiler makeup, for TPP-3 in Astana city. The company's technical experts have already implemented designing and manufacturing works. Start-up and commissioning operations will be performed soon at the Customer's site. The manufactured WTP will be used for production of softened water for heating network makeup and desalinated water for boiler makeup.  

form-link

Благодарим! Сообщение успешно отправлено. В ближайшее время с Вами свяжутся наши специалисты.

form-link